Skip to main content

The essential steps before handing-over a borehole to the community

(eds)
Toolkit
G04243
Language:
Download
PDF  G04243.pdf (137.23 KB)

This concise and accessible GWI guide clearly outlines the steps required before, during and after the construction of water points, which must all be completed before the management of the water points is transferred to the community.

Published:
Product code:
G04243